No sales pitch, just what we would tell you if you called and asked.
Most people who own a standby generator are not generator specialists — they are property managers, facility leads and building owners with a hundred other things to think about. These articles are written for them.
CSA C282 Generator Requirements in Ontario: A Building Owner’s Guide
What CSA C282 means for emergency generators in Ontario buildings: who is responsible, the weekly to annual schedule, the annual load test and the log book.
Winter Readiness for Standby Generators: An Ontario Facility Manager’s Checklist
Don’t wait for the first winter blizzard to find out if your standby power system is ready. Check out GenWorx’s pre-winter checklist covering block heaters, battery health, coolant freeze protection, and fuel management for Southern Ontario commercial and industrial facilities.
The Cost-Effective Alternative to Replacing Your Commercial ATS
Replacing an entire automatic transfer switch (ATS) isn’t your only option when legacy controls fail or components become obsolete. Discover how a control panel conversion modernizes your emergency power infrastructure, slashes downtime, and maximizes your capital budget—without requiring a full enclosure tear-out.
The question we get asked more than any other. Weekly, monthly, semi-annual and annual — what a standby generator actually needs, and who is responsible for making sure it happens.